Pre-Drilling (Modeling):
-
Building
the Geological Blocks: Sequence Stratigraphy, Depositional Style,
Structural Evolution, Faults and salt timing etc.
-
QC and apply Seismic
Velocities for predicting PP
-
QC and apply Petrophysical Data of Offset
Wells for predicting PP / FP
-
Establish PP / FP Parameters, Exponents,
and calculate NCT
-
Build the Prediction Model and Calculate PP-FP Profiles
in psi and ppg of proposed location
-
Pre-Drilling Compartmentalization
Evaluation (when possible)
-
Establish Casing and Mud Programs and Expected
Drilling Challenges
-
Predict drilling challenges along the bore hole
trajectory
During-Drilling (Calibration):
-
MWD, Mud Logs, Measurements,
Drilling Events
-
Calibration of the Pre-Drilling Geopressure Model (new
approach)
-
Ahead of the Drilling Bit Prediction
Post-Drilling (Appraisal):
- Success
or Failure Assessments
- Appraisal of vertical and lateral seals and
the exploration potentials in the offset structural segments
- Calculating
of Sealing and Hydrocarbon Retention capacities
- Trapped hydrocarbon
limits and volume
"Everyone felt that, at present, there were just some 'cookbook' formulas for addressing velocity that sometimes fit and sometimes do not"
"There is a lack of calibration to give confidence in some of the technologies that are being used"
Roegiers J, Chair of SPE/AAPG/SEG workshop addresses pore-pressure uncertainties, TLE August 2007